NDS have been contracted to carry out all the lift and shift at Holborn
NDS continued to carry out the strip out and installation of cooling towers at a site in Holborn at the weekend. NDS

NDS were awarded the contract lift and plant movement for a major M&E client in the prestigious Canary Wharf area.
NDS were awarded the contract lift and plant movement for a major M&E client to lift 3 x 13 tonne chillers, 4 x

Removal of redundant material in Holborn
NDS successfully completed a removal of redundant material from a prestigious building in Holborn, London.

Plant Movement completed at Procat
Successful Plant Movement completed at Procat South Essex College of Further and Higher Education in the Rail, Marine

Chiller Supplied and Installed in Soho, London
Replacement chiller supplied and installed at the Yauatcha Restaurant in Soho

Contractor to strip out all redundant dry air coolers and pipework, Holborn London
NDS were appointed as the mechanical contractor to strip out all of the redundant dry air coolers and pipework at a p

Significant plant movement works successfully completed at Morrisons, Edgeware London
NDS were called in to lift a steel gantry beam 12 metres long with gross weight of 800kg into a plantroom at a Morris