Fume Cupboard Testing Specialists.

NDS is capable of providing fume cupboard airflow testing of any size and throughout London and Essex.

In the UK it is a legal requirement to carry out Fume Cupboard Airflow testing at regular intervals. Doing this will help to ensure your workforce is safe, as well as monitoring that your fume cupboard or extraction system is working and functioning in the correct way.

Our Airflow Testing

NDS can carry out routine inspections of fume cupboards together with their associated ductwork and fan units. The airflow measurements are checked and a report is compiled.

Testing is carried out in accordance with the British Specification BS7258 or Building Bulletin 88 (Revision for Design Note 29), depending on the fume cupboard application.

Fume Extraction in London

A carefully designed and installed fume extraction system is essential in order to improve the safety, performance and efficiency of your fume cupboard or LEV device, alongside reducing running costs and noise levels.

NDS Mechanical Services pride ourselves in having a team of very experienced fume extraction engineers to design, supply and install extract systems in accordance with the requirements and recommendations of BS:EN14175, HVCA DW/154, BB:88 and other relevant standards.

If you would like to find out more about our installation services relating to fume cupboard airflow testing in London or Essex, please get in touch and our team will be happy to answer any enquiries you have.

fume extraction in London

RESOURCE CENTER

Project Completion: Eden House image004-3

Project Completion: Eden House

We have recently completed the CAT B fit out of 4 floors of @Daikin VRV and the full mechanical CAT B fit out on anot

Site temps progress update image001-10

Site temps progress update

We are making good progress reinstalling 2 Daikin VRV systems that we supplied and installed for a previous site temp

100 Shoreditch Hotel Boiler Plant Room Refurbishment Image 9

100 Shoreditch Hotel Boiler Plant Room Refurbishment

NDS was approved as the main contractor to carry out the refurbishment of the main boiler plant room and the existing

Long Lane Jaguars, Remembrance Sunday Football Match

News image001-9

NDS & Mitsubishi Electric are proud to sponsor local foo...

Apprentices learning hands on

News App image 2

This week three of our apprentices have been on site assisti...

Thank you for confirming the completion of the job at Colemore Court. I would also like to compliment you and your staff on the efficient and professional attitude you have exhibited towards us.

J.Bendall

J.Bendall

Gratte Brothers Ltd

I am the Office Manager at Van Ameyde & Wallis and would just like to express our thanks to two of your employees… They have finally repaired our broken Air-con system which has not worked properly for a period of at least a year.

Julia Lockyer

Julia Lockyer

Van Ameyde & Wallis Limited

A complete bespoke solution, installed by NDS Mechanical, working with main contractor HBG Construction and building services contractor Gratte Brothers, was provided through Daikin VRV Heat Recovery units.

To ensure that the building would be heated effectively throughout, the VRV Heat Recovery units were spread though plant rooms across the buildings ten storeys.

Daikin

Daikin