Explore our Plastic Fume Extract Ductwork.

NDS is capable of installing plastic fume extract ductwork systems of any size and have completed ductwork contracts for some of London’s biggest and most prestigious new developments.

NDS fume extract systems are designed to meet the specific requirements of each individual installation. Design considerations include:

  • Noise levels
  • Emission requirements
  • Aesthetic requirements
  • Fire hazards
  • Environmental contamination

Ductwork Materials

NDS ductwork systems can be manufactured from Polypropylene, uPVC or PVDF. The plastic ducting can also be glass fibre reinforced to:

  • Aid strength
  • Protect from ultra-violet degradation
  • Improve fire resistance

Specifications

NDS Mechanical Services pride ourselves in having a team of very experienced fume extraction engineers to design, supply and install extract systems in accordance with the requirements and recommendations of many relevant standards.

Ductwork systems can be designed in accordance with DW151, SMACNA, LGC1614, BS:EN14175, HVCA DW/154, BB:88 or to a customer’s specification.

Plastic Fume Extract Ductwork Experience

We are proud to have the ability to supply and install uPVC and PPS ductwork in forensic and commercial laboratories and have even been appointed by the British Transport Police to replace their entire extraction system in forensic labs in London. From heating and ventilation systems to dust and fume extraction in London, you can trust our team to complete any installation to the highest standards.

If you would like to find out more about our plastic fume extract ductwork, please get in touch and our team will be happy to answer any enquiries you have.

plastic fume extract ductwork

RESOURCE CENTER

Project Completion: Eden House image004-3

Project Completion: Eden House

We have recently completed the CAT B fit out of 4 floors of @Daikin VRV and the full mechanical CAT B fit out on anot

Site temps progress update image001-10

Site temps progress update

We are making good progress reinstalling 2 Daikin VRV systems that we supplied and installed for a previous site temp

100 Shoreditch Hotel Boiler Plant Room Refurbishment Image 9

100 Shoreditch Hotel Boiler Plant Room Refurbishment

NDS was approved as the main contractor to carry out the refurbishment of the main boiler plant room and the existing

Long Lane Jaguars, Remembrance Sunday Football Match

News image001-9

NDS & Mitsubishi Electric are proud to sponsor local foo...

Apprentices learning hands on

News App image 2

This week three of our apprentices have been on site assisti...

Thank you for confirming the completion of the job at Colemore Court. I would also like to compliment you and your staff on the efficient and professional attitude you have exhibited towards us.

J.Bendall

J.Bendall

Gratte Brothers Ltd

I am the Office Manager at Van Ameyde & Wallis and would just like to express our thanks to two of your employees… They have finally repaired our broken Air-con system which has not worked properly for a period of at least a year.

Julia Lockyer

Julia Lockyer

Van Ameyde & Wallis Limited

A complete bespoke solution, installed by NDS Mechanical, working with main contractor HBG Construction and building services contractor Gratte Brothers, was provided through Daikin VRV Heat Recovery units.

To ensure that the building would be heated effectively throughout, the VRV Heat Recovery units were spread though plant rooms across the buildings ten storeys.

Daikin